Migrating from v1
Upgrade a v1 tree once with tasks migrate — what it changes, what it refuses, the two consequences, and what to commit.
The normative version
Specification › migration from v1 defines the upgrade and summarizes what changed. This page is the walkthrough.
A v1 tree — one whose config.yml is missing, has no version, or says version: 1 —
is refused by every v2 command that opens it (skill install and hooks install only write
beside it), except one:
✗ /Users/you/acme-api/.tasks is a .tasks v1 tree. Run `tasks migrate` once to upgrade it to v2; every other command refuses a v1 tree.tasks migrate upgrades it in place, once. There is no way back except git, which is
the point: run it on a clean working tree and review the result as a diff.
Before you start
- Commit or stash everything else, so the migration is one reviewable change.
- Run it in the checkout and on the branch where task state lives — the integration branch — with no other session working the tree.
- Install the v2 CLI. The v1 CLI cannot read the result.
Run it
tasks migrate✓ Migrated /Users/you/acme-api/.tasks to .tasks v2: 3 tasks
phases auth, release_1.2 → release-1-2
statuses PENDING → TODO, IN_PROGRESS → IN_PROGRESS, REVIEW → PAUSED, DONE → DONE
scope auth
references 2 rewritten, 0 kept as written
README.md none
index.md generated
! IN_PROGRESS with claimed_session: null, so the liveness of each claim is unknown and a claimant that runs with a session token recovers it only with --force: auth/token-schema
! PAUSED without a state.md, which validation reports until one is written (`tasks state <task>`): auth/wire-refreshRun it from the repository root, or with -C <dir>. It works under the tree's lock,
reads and checks everything first, and writes nothing until every check has passed. A
second run is refused: the tree is already v2. --json prints the same result as one
document — see the JSON contract.
What it changes
- Phases become groups. Every phase name is checked against the v2 segment pattern,
^[a-z0-9][a-z0-9-]*$; v1 also allowed.and_. - Files become directories. Each
<phase>/<id>.mdmoves to<phase>/<id>/task.md; each.archive/<id>.mdto.archive/<phase>/<id>/task.md, using itsphasefield. - Fields.
idandphaseare dropped — identity is the path now — andpriority: normal,finishes_after: [],assignee: nullandclaimed_session: nullare added. The body is kept as it is. - Statuses are mapped through the v1 roles: the
readyrole's status becomesTODO, theclaimedrole'sIN_PROGRESS, thedonerole'sDONE. With v1's defaults that isPENDING→TODO,IN_PROGRESS→IN_PROGRESS,DONE→DONE. - References. Every
depends_onbare id that names a task becomes its path,<phase>/<id>; one that names none is kept as it was and listed. An external reference is rewritten when its tree is reachable and holds the id, and is otherwise kept as it was and listed. config.ymlbecomesversion: 2;active_phasebecomesscope;statuses,rolesandtransitionsare removed — the lifecycle is fixed.- The index. v1's
_index.mdis removed andindex.mdis generated.
---
-id: wire-refresh
-phase: auth-rework
-status: PENDING
-depends_on: [token-schema]
+status: TODO
+priority: normal
+depends_on: [auth-rework/token-schema]
+finishes_after: []
+assignee: null
+claimed_by: null
+claimed_at: null
+claimed_session: null
created: "2026-08-21T09:14:00Z"
updated: "2026-08-21T09:14:00Z"
-claimed_by: null
-claimed_at: null
---.tasks/README.md is replaced with the v2 scaffold when it is exactly v1's scaffold; an
edited one is kept — it still describes v1 — and the migration says so. Nothing is
appended to any log: a v1 task's history is the ## Notes of its body, which travels
with it unchanged.
What it refuses
Nothing is written while a problem remains. The refusal is one usage error (exit 2)
that lists every problem at once, each with a kind in details.problems, so one run
tells you everything to fix:
✗ Cannot migrate /Users/you/acme-api/.tasks to .tasks v2; nothing was written. Fix these first:
- phase "release_1.2" is not a v2 directory name (^[a-z0-9][a-z0-9-]*$); v1 allowed . and _ in a phase name, v2 does not: rename it with --map-phase release_1.2=<name>
- status "REVIEW" of .tasks/auth/wire-refresh.md is outside the roles mapping (ready PENDING → TODO, claimed IN_PROGRESS → IN_PROGRESS, done DONE → DONE): map it with --map REVIEW=<status>, one of BACKLOG, TODO, IN_PROGRESS, PAUSED, DONE, CANCELLED
- .tasks/auth/token-schema.md: claimed_by "build bot" does not match the actor pattern ^[A-Za-z0-9][A-Za-z0-9._@+-]*$; correct it in the v1 filekind | Problem | Fix |
|---|---|---|
unmapped-phase | A phase name with . or _, or otherwise not a v2 segment | --map-phase OLD=NEW, once per phase: --map-phase release_1.2=release-1-2 |
unmapped-status | A status outside the v1 roles, or one status carrying two roles | --map OLD=NEW to one of the six v2 statuses: --map REVIEW=PAUSED |
unknown-mapping | A --map or --map-phase naming a status or phase the tree does not have | Drop it, or fix the spelling |
invalid-value | A value v2 cannot hold: a claimed_by with a space, a timestamp that is not ISO 8601, an id that is not a v2 segment, a v2 key in a v1 file | Correct it in the v1 file — "build bot" → build-bot — then run again |
claim-fields | A task mapped to IN_PROGRESS nobody claimed, or claim fields on a task mapped to anything else | Map its status elsewhere, or fix the claim fields in the v1 file |
malformed | A v1 file that does not parse, or a phase directory that is a symbolic link | Repair it by hand; nothing is migrated around a broken file |
duplicate-id | Two live, or two archived, v1 tasks with one id | Keep one |
collision | Two phases mapped to one name, a destination that already exists, an archived task landing on a live task's path, an existing index.md | Rename one side first; merging phases is tasks move's job afterwards |
tasks migrate --map REVIEW=PAUSED --map-phase release_1.2=release-1-2A custom status usually maps to PAUSED (started, waiting) or TODO (not started).
What a status like BLOCKED meant is now computed from depends_on, so it maps to the
status the task is otherwise in. --map can also override what a role's status maps to,
and --map-phase can rename a phase whose name is already valid.
The two consequences
The migration prints these, as ! lines naming the tasks, when they apply — together
with the references it kept as written, an edited README.md it kept, and an
active_phase that named no phase and so became no scope:
- A task migrated to
IN_PROGRESScarriesclaimed_session: null. Its liveness is unknown, so it cannot be taken over. Its claimant can stillpauseit after writing astate.md— orreleaseit if nothing was done — and an agent running with a session recovers it only withtasks claim <task> --force, on a person's say-so. - A task mapped to
PAUSEDhas nostate.md.validatereports it (paused-without-state) until one is written withtasks state <task>.
References from other trees
Other trees that depended on this one still carry bare ids, ../acme-api:token-schema.
The migration rewrites them — to ../acme-api:auth-rework/token-schema — in the tree the
command runs in and in every tree that tree lists under projects:, one tree at a time
under each tree's lock. References it finds in trees it can read but not write are
listed; they resolve as missing until someone edits them.
Migrating a listed project
From a v2 tree that lists a v1 project — a tracker that lists a product repository not yet upgraded — migrate it by alias:
tasks migrate backendThe listed tree is upgraded under its own lock, and the tracker's references into it —
../backend:claims-api — become paths, ../backend:kernel/claims-api, in the same run.
Until then, overviews leave the project out with a line saying so, and references into
it block with unsupported-version.
What to commit
tasks validate # clean except the predicted warnings
tasks skill install --force # the v1 skill describes v1 commands
git add -A .tasks .claude/skills/tasks
git commit -m "Migrate .tasks to v2"The commit holds the renames, the rewritten manifests and config.yml, the removed
_index.md and the new index.md. Refresh the installed skill in the same commit: an
agent that reads the v1 skill would reach for tasks status, which no longer exists.
Tell the people and agents who work the tree that the vocabulary changed; the
concepts page is the short version.