Gates
The start gate and the finish gate, every blocking reason, cycles, dep and after, and stranded dependencies.
Explanatory, not normative
The authoritative definition is specification › dependencies and gates, including every reason and the cycle rules.
A task has two gates. Both are computed from the current state of other tasks on every query, never stored, and both fail safe: anything that cannot be resolved confidently counts as blocking.
| Gate | Made of | Satisfied when every reference is | Checked by | --force |
|---|---|---|---|---|
| Start | depends_on | a live task that is DONE | claim, done | overrides |
| Finish | every live child, plus finishes_after | a live task that is DONE or CANCELLED | done | never |
References
A reference names a task by its path. A local reference is just the id; a reference into another tree is prefixed with that tree's project path, relative to the project root of the tree that stores it:
depends_on: [auth-rework/token-schema, "../backend:kernel/claims-api"]reference = path | project-path ":" path
path = segment *("/" segment) segment = ^[a-z0-9][a-z0-9-]*$The string splits on its last colon; segments cannot contain one. A project path is
never absolute. On the command line you name the target like any task — full id,
unambiguous suffix, or alias:path for a project listed in config.yml — and the CLI
stores the full form, translating the alias into the relative path:
tasks dep add deploy execute # both suffixes, stored as full ids
tasks after add launch backend:claims-api # stored as ../backend:kernel/claims-apiThe start gate
depends_on lists the tasks that must be DONE before this one may be claimed or
done. A reference that is not satisfied carries exactly one reason:
| Reason | The target… | Can waiting help? |
|---|---|---|
not-done | exists, is live and open | yes |
cancelled | exists and is CANCELLED | no — stranded |
missing | does not exist, live or archived; also a reference that does not parse | no |
archived | exists only under .archive/ | no |
malformed | exists, but its task.md cannot be parsed | no |
unresolved-project | is in a project path that does not lead to a tree | no |
not-checked-out | is in a listed project whose directory is absent on this machine | no |
unsupported-version | is in a tree of a version this CLI does not support, a v1 tree included | no |
Overviews show the reference, with the reason when waiting cannot help:
blocked by auth-rework/token-schema, blocked by billing/invoices (cancelled).
validate reports every reference that can never be satisfied as a warning
(unsatisfiable-ref).
--force on claim or done overrides the start gate, and the log records it. Use it
only when a person has said the dependency does not apply.
The finish gate
A task is done only after its parts are: every live child must be DONE or
CANCELLED, and so must every reference in finishes_after. An unresolvable
finishes_after reference blocks, with the reasons above.
finishes_after is a join on a task in another scope — typically an epic in a tracker
repository waiting for its parts in the product repositories. It is not containment:
cancel neither cancels those tasks nor waits for them.
tasks done auth-rework -m "…"✗ auth-rework cannot be done: open children auth-rework/wire-refresh. Resolve them first; the finish gate cannot be forced.The gate is a constraint, not a derivation: the parent's status stays a manual fact. When
every child is resolved, overviews show the parent as closable — it can be closed
either way, done or cancel, without touching anything else. Consequences the CLI
enforces:
- No task is created, moved or restored under a resolved parent.
- A child of a resolved parent cannot be reopened while the parent is resolved.
- A resolved task with a live open descendant is a validation error.
Cancelled dependencies are stranded
Cancelled work satisfies a finish gate — the parent's deliverable was redefined — but never a start gate: nothing can be built on it. A task that depends on a cancelled task is therefore stranded: waiting cannot open its gate. Only a person can, in one of three ways:
- Cancel the dependent too, because its premise died with the dependency.
- Remove the reference with
tasks dep rm, because the dependent can proceed without it. - Point it elsewhere, at whatever now does that work.
The tool never cancels dependents on its own, because any of the three may be right. It
makes the stranding visible instead: the cancel that caused it lists them as
dependents in its result — in the local tree and in listed projects — every overview
shows blocked by A (cancelled), and validate warns. A reopen of the dependency
unblocks them without touching them, because blocking is computed.
tasks cancel invoices -m "Billing moves to the payment provider."✓ cancel billing/invoices: TODO → CANCELLED
! stranded dependents: billing/remindersCycles
The two gates form one graph: a depends_on reference is an edge, and so is the finish
edge from each child and each finishes_after reference to the task. A cycle in that
graph means the tasks in it can never all resolve.
tasks dep add and tasks after add refuse, before writing anything:
| Refusal | Exit | details.kind |
|---|---|---|
| a reference to the task itself | 2 | — |
| a task that does not exist, or is archived | 3 | — |
| a reference to the task's own ancestor | 4 | ancestor |
| a reference that would close a cycle | 4 | cycle |
A dependency on an ancestor is a guaranteed deadlock: the ancestor is done only after its children. The cycle refusal names the cycle:
{
"error": {
"code": "CONFLICT",
"message": "Adding a to the depends_on of b would close a cycle: b → a → b.",
"details": { "id": "b", "field": "depends_on", "ref": "a", "kind": "cycle", "cycle": ["b", "a"] }
}
}Edges into other trees join cycle detection when those trees are listed under
projects: and checked out; otherwise they cannot be walked and count as non-edges. A
cycle that reaches the tree anyway — through a hand edit or a merge — is a validate
error (cycle, and ancestor-dependency for a dependency on an ancestor).
Editing the gates
tasks dep add wire-refresh token-schema
tasks dep rm wire-refresh token-schema
tasks dep list wire-refresh
tasks after add launch backend:claims-apiauth-rework/wire-refresh depends_on
REFERENCE SATISFIED DETAIL
auth-rework/token-schema yes DONEAdding a reference that is already present changes nothing. rm takes a reference as
stored — as list prints it — or as add would resolve it, and fails with exit 3 when
the task does not hold it. Each edit logs dep add: … or after rm: … on the task.
list --json reports every reference with satisfied, reason and the target's
status; see the JSON contract.
Archiving what others depend on
Archiving a task that open tasks reference would leave them blocked for good, so
tasks archive refuses it and names the dependents. --force archives anyway and
reports which tasks it left blocked. Because an archived path stays reserved, a task
recreated at the same path is refused rather than silently reconnected to those
references; tasks purge is the explicit decision to allow it.
Modelling advice
Prefer several small dependent tasks over one large one. A single task with a ten-item checklist tells the next agent nothing about what is unblocked; the same work split into four tasks with two edges tells it exactly where to start.
- A dependency expresses order, not ownership. Two tasks that can proceed in parallel stay independent even when one person does both.
- Parts of one deliverable are children, not dependencies: the parent's finish gate already waits for them.
- A step a person must take — a review, an approval, a deploy — is a
handoffwhen it concerns one task, and a separate task assigned to that person only when other tasks must depend on it.